Kelowna, British Columbia--(Newsfile Corp. - October 29, 2024) - F3 Uranium Corp (TSXV: FUU) (OTC Pink: FUUFF) ("F3" or "the Company") is pleased to announce assay results for thirteen drillholes of the ongoing 2024 drill program on the PLN Property, including PLN24-161 at the JR Zone (see NR August 13, 2024) which returned 10.5m of 2.66% U3O8, including a high grade 2.0m interval averaging 12.0% U3O8, further including an ultra-high grade core of 0.5m of 20.7% U3O8. Significant mineralization over a 13.5m interval was intersected in PLN24-184 on line 105S at JR, including 1.5m off-scale radioactivity (>65,535 cps) between 235.60 and 240.10m.

Exploration drilling focused mainly on the B1 area close to, and south of the Harrison Fault, with a number of very prospective drill holes, highlighted by PLN24-187 which was drilled on line 3240S, approximately 400m south of the Harrison Fault, and on section with PLN24-183. PLN24-183 was the first hole to intersect what is interpreted to be the southern extension of the A1 shear zone hosting the JR Zone. Due to encouraging alteration and intense shearing a down dip hole was drilled, and PLN24-187 encountered intense alteration and anomalous radioactivity (see Table 1 and Photo 1).

Sam Hartmann, Vice President Exploration, commented:

"Today's update includes scintillometer results of drilling in the JR Zone, where three holes successfully targeted high grade mineralization in areas of lower drill hole density, as well as high-grade assay results of drillholes completed and previously announced earlier in the program. Exploration drilling south of the Harrison Fault discovered the A1 Shear Extension, ~400m beyond the previously interpreted southern extent of the A1 shear, as a discrete continuation, and parallel to the B1 structures. This potential for stacked and parallel structure south of Harrison Fault provides further high priority drill targets for high grade uranium mineralization."

JR Zone Assay Highlights:

PLN24-161 (line 035S):

  • 10.5m @ 2.66% U3O8 (206.5m to 217.5m), including:
  • 2.0m @ 12.0% U3O8 (207.5m to 209.5m), further including:
  • 0.5m @ 20.7% U3O8 (208.0m to 208.5m)

PLN24-163 (line 095S):

  • 13.0m @ 0.45% U3O8 (197.0m to 210.0m), including:
  • 2.5m @ 1.77 % U3O8 (204.0m to 206.5m)

JR Zone Handheld Spectrometer Highlights:

PLN24-184 (line 105S):

  • 13.5m mineralization from 228.5m - 242.0m, including
    • 3.80 m cumulative mineralization of >10,000 cps radioactivity between 233.00m - 240.30m, including 1.5m cumulative off-scale radioactivity (>65,535 cps) between 235.60 -240.10m

PLN24-185 (line 025S)

  • 13.0m mineralization from 218.0m - 231.0m, including
    • 2.30 m cumulative mineralization of >10,000 cps radioactivity between 223.00m - 230.50m, including 0.5m cumulative off-scale radioactivity (>65,535 cps) between 223.00 -2424.00m

Exploration Handheld Spectrometer Highlights:

PLN24-178 (line 2835S): B1 Exploration

  • 0.5m radioactivity from 446.5m - 447m with a peak of 310 cps

PLN24-180 (line 1125S): A1 South Exploration

  • 0.5m radioactivity from 319.0m - 319.5m with a peak of 700 cps

PLN24-181 (line 2880S): B1 Exploration

  • 0.5m radioactivity from 377.5m - 378.0m with a peak of 360 cps

PLN24-187 (line 3240S): B1 Exploration

  • 0.5m radioactivity from 549.0m - 549.5m with a peak of 300 cps

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8110/228040_figure1a.jpg

Figure 1: JR Zone Assay and Spectrometer Results


To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_figure1.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8110/228040_plndrill2a.jpg

Figure 2: 2024 Drilling on A1 and B1 Shear Zones and new A1 Shear Extension

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_plndrill2.jpg

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8110/228040_2deb68b6544e78ce_003.jpg

Photo 1. A1 Extension in PLN24-187

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_2deb68b6544e78ce_003full.jpg

Table 1. Drill Hole Summary and Uranium Assay Results


Collar Information

Assay Results
Hole ID Grid LineEastingNorthingElevationAzDipFrom
 (m)
To
 (m)
Interval
(m)
U3O8 weight %
PLN24-153555S588064.376410321.99534.56-72.055.6A1 Exploration; no mineralization >0.05
PLN24-1542100S587534.076408053.06531.83-60.235.9A3 Exploration; no mineralization >0.05
PLN24-1551215S588507.316409827.87536.43-69.958.0A1 Exploration; no mineralization >0.05
PLN24-1561335S588571.286409726.11543.90-70.053.2A1 Exploration; no mineralization >0.05
PLN24-1572745S589215.286408451.38540.75-65.354.2A1 Exploration; no mineralization >0.05
PLN24-1582040S588934.866409122.90543.88-70.156.5A1 Exploration; no mineralization >0.05
PLN24-1592235S589041.266408957.53543.16-70.552.4A1 Exploration; no mineralization >0.05
PLN24-1602430S589122.806408773.08543.36-71.559.0A1 Exploration; no mineralization >0.05
PLN24-161035S587790.976410763.91546.37-80.357.0206.50207.501.000.19







207.50209.502.0012.0






incl208.00208.500.5020.7







209.50217.007.500.49






incl215.50216.000.502.31
PLN24-1622850S589301.356408383.61538.03-67.954.5A1 Exploration; no mineralization >0.05
PLN24-163095S587813.116410709.84546.85-78.552.4197.00204.007.000.09







204.00206.502.501.77






incl205.50206.000.503.32







206.50210.003.500.24
PLN24-1642880S589259.506408356.75538.22-65.368.9A1 Exploration; no mineralization >0.05
PLN24-1653195S589613.776408183.67535.01-72.455.0B1 Exploration; no mineralization >0.05











 

Assay composite parameters:
1: Minimum Thickness of 0.5 m
2: Assay Grade Cut-Off: 0.05% U3O8 (weight %)
3. Maximum Internal Dilution: 2.0 m

Table 2. Drill Hole Summary and Handheld Spectrometer Results

Collar Information* Hand-held Spectrometer Results On Mineralized Drillcore (>300 cps / >0.5m minimum)Athabasca Unconformity Depth (m)Total Drillhole Depth (m)
Hole IDSection LineEastingNorthingElevationAzDipFrom
(m)
To
 (m)
Interval (m)Max CPS
PLN24-1782835S589250.16408364.9537.6-66.553.5446.50447.000.50310175.4554
PLN24-1794245S590177.86407292.3542.2-64.354.2B1 MSZ Exploration; no radioactivity
>300 cps
372.8533
PLN24-1801125S588192.36409710.1542.3-60.154.4319.00319.500.50700n.a.556
PLN24-1812880S589300.56408383.0539.6-65.179.3377.50378.000.50360200.0, 308.6, 360.3466
PLN24-1825280S590644.16406355.3539.2-71.853.6B1 MSZ Exploration; no radioactivity
>300 cps
342.7446
PLN24-1833240S589413.86407982.6530.1-59.054.1B1 MSZ Exploration; no radioactivity
>300 cps
392.6743
PLN24-184105S587752.66410654.2544.6-62.153.2207.50208.000.50540194.4290







228.50229.000.50980








229.00229.500.50560








229.50230.000.501100








230.00230.500.50540








230.50231.000.50<300








231.00231.500.502400








231.50232.000.50690








232.00232.500.50680








232.50233.000.50540








233.00233.500.5036100








233.50233.800.3022100








233.80234.000.209900








234.00234.500.50350








234.50235.000.507200








235.00235.500.508700








235.50235.600.1065500








235.60235.900.30>65535








235.90236.000.1065500








236.00236.500.50550








236.50237.000.5016900








237.00237.500.50730








237.50238.000.501700








238.00238.150.1565500








238.15238.500.35>65535








238.50238.650.1565500








238.65239.000.35>65535








239.00239.200.2023300








239.20239.500.309900








239.50239.600.1065500








239.60240.000.40>65535








240.00240.100.10>65535








240.10240.300.2065500








240.30240.500.209900








240.50241.000.50520








241.00241.500.50620








241.50242.000.50440








244.00244.500.50750








244.50245.000.50810

PLN24-185025S587736.86410738.8545.3-65.952.9218.00218.500.50570197.2278







218.50219.501.00<300








219.50220.000.50800








220.00220.500.50630








220.50221.000.50380








221.00222.001.00<300








222.00222.500.506100








222.50223.000.505600








223.00223.300.30>65535








223.30223.500.2059400








223.50223.800.3058700








223.80224.000.20>65535








224.00224.500.5046700








224.50224.850.3523200








224.85225.000.159800








225.00225.250.2517600








225.25225.500.259100








225.50226.000.508300








226.00226.500.504600








226.50227.000.508000








227.00227.500.50800








227.50228.000.50380








228.00228.500.50800








228.50230.001.50<300








230.00230.300.305200








230.30230.500.2033000








230.50231.000.501100

PLN24-186035S587810.16410777.2545.7-79.250.9186.50187.000.50360175.0263







187.00187.500.50810








187.50188.000.50310








188.00188.500.50350








188.50189.000.50<300








189.00189.500.50560








189.50190.000.501100








190.00190.500.501400








190.50191.000.501700








191.00191.500.502400








191.50191.650.154100








191.65192.000.3513100








192.00192.500.502600








192.50193.000.502000








193.00193.500.5013300








193.50194.000.509400








194.00194.500.507000








194.50195.000.502800








195.00195.500.503500








195.50196.000.50330








196.00196.500.501700








196.50197.000.501300








197.00197.500.50470

PLN24-1873240S589410.26407980.4530.8-65.453.8549.00549.500.50300373.0713













 

Handheld spectrometer composite parameters:
1: Minimum Thickness of 0.5m
2: CPS Cut-Off of 300 counts per second
3: Maximum Internal Dilution of 2.0m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials.

Composited weight % U3O8 mineralized intervals are summarized in Table 1. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS.

The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as "high grade" and results greater than 20.0 weight % U3O8 as "ultra-high grade."

All depth measurements reported are down-hole and true thickness are yet to be determined.

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has verified the data disclosed.

About F3 Uranium Corp:

F3 Uranium is a uranium exploration company advancing its newly discovered high-grade JR Zone and exploring for additional mineralized zones on its 100%-owned Patterson Lake North (PLN) Project in the southwest Athabasca Basin. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone discovery is located ~25km northwest of Fission Uranium's Triple R and NexGen Energy's Arrow high-grade uranium deposits. This area is poised to become the next major area of development for new uranium operations in northern Saskatchewan. The PLN project is comprised of the PLN, Minto and Broach properties. The Broach property incorporates the former PW property which was obtained from CanAlaska as a result of a property swap.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are "forward-looking statements." These forward-looking statements reflect the expectations or beliefs of the management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully, and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2

Contact Information
Investor Relations
Telephone: 778 484 8030
Email: ir@f3uranium.com

ON BEHALF OF THE BOARD
"Dev Randhawa"
Dev Randhawa, CEO

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/228040