Advancing the Excelsior Springs Project in Nevada's Walker Lane Gold District

Drone video at the historic Buster Mine at the Excelsior Springs Project. 

Top-Tier Exploration & Mining Jurisdiction

- Goldfield: 5M oz Au
- Bullfrog: 2M oz Au
- Tonopah: 2Moz Au
- Mineral Ridge: 1.5Moz Au
Click Here

Comprehensive Exploration

- Drill program to start in 3Q 2021
- Goal of expanding mineralization and developing mineable resources
Click Here

Near Term Results Expected

- Q3: RC Drilling
- Q4: Geophysics
- Q1: Core Drilling
Click Here

Significant Mineralization

61% of the historic drill results show gold mineralization above the typical Nevada, open-pit-mine cut of grade of 0.25g Au/T
Click Here

Committed & Experienced Team

John Power, President of Athena Silver (now Athena Gold) since 2010. History of providing high returns to investors.
Click Here

De-Risked Project with Blue Sky Potential

Opportunity to define a commercial resource by leveraging the latest exploration technologies utilizing the extensive, historical project database.
Click Here

A World Class project with a new Vision

Excelsior Springs In The Heart of The Walker Lane Trend

The Walker Lane Trend is known for several gold projects that produced more than 1 million ounces. Based on previous drill results, Excelsior Springs is building on a history of success and has potential to join this prestigious group of Walker Lane projects.

Upper Shaft, 880 east of Buster Shaft

A Modern, Sustainable Approach

We strive to utilize the best practices in order to maintain rigorous safety and health standards. As we continue to advance on our projects, we will adhere to all applicable government regulations and utilize opportunities to apply renewable energy resources. We place emphasis on the importance of being a good neighbor and work collaboratively with nearby landowners and communities to ensure strong, long-term connections.